EN
UA
URC DTEK 2026 CCGT Power Plant

CCGT Power Plant

URC DTEK 2026 / CCGT Power Plant
Project owner
DTEK Energy
Location
Ivano-Frankivsk region
Total capacity
650 MW
Project owner
DTEK Energy LLC is a major supplier of electricity to the Ukrainian grid, with a twenty-five-year track record of operating system-critical thermal power plants. The company generated over 11.8 TWh of electricity in 2025.
pic
Project timeline

2025 – 2026

Feasibility study

2026 – 2027

Design

2028 – 2031

Construction

2031

Start of operation